Skip to main content
Loading…
This section is included in your selections.

A. Once the applicant’s proposed development has been substantially completed, the applicant shall apply to the director for a certificate of compliance. This application shall be accompanied by a certified statement or report from a registered engineer, architect, certified hydrologist or land surveyor, whichever is applicable, stating that the applicant’s development complies with applicable requirements and standards set forth in this chapter. At a minimum, this will include an elevation certificate certifying the elevation of the lowest finished floor (including basement) of all new and substantially improved buildings. If the applicant’s floodplain permit required floodproofing measures, these shall be certified by a registered professional engineer or registered architect. An application for a certificate of compliance shall be made no later than 60 days after obtaining an elevation certificate or floodproofing certificate, if required.

B. Upon submission of the required certification(s), the director shall issue the certificate of compliance to the applicant. (Ord. 2009-55 § 2, 2010. 2004 Code § 15.04.055.)